Big Ducks New Pool -Pt 1

Originally, this black plastic formed pool was in this section but I pulled it out in early spring 2010.  I spread out the sand and set this space up as a temporary duckling brooder area. They lived there for 3.5 months when I decided it was time to get started on the construction of the new duck pool.

 

Old Pool
Old pool

 .

.

Pulling out the old pool

Pulling old pool out

.

.

Spreading sand around the run

Spreading sand around

.

.

Emmaline checking things out

Emmaline checking things out

 .

.

Everyone checking things out

Everyone checking things outpace

.

.

Installing drain pipe

Installing waste drain

 .

.

Waste Drain

Waste drain exit

.

.

Phase 1 of sculpting angled sand walls

Started sculpting angled sand walls

.

.

Reinstalled West wall

Reinstalled west wall

.

.

Phase 2 of angled walls completed and lightly sprayed with water to further compact sand.

2nd phase of angled walls-water sprayed

.

.

Using stripping pieces to help angle and build onto the walls correctly

stripping used to help angle walls

.

.

3rd and final phase of angled walls completed.  Sprayed with water to compact sand again.

3rd phase angled walls completed

.

.

Installing under layment

Installing underlaymentce

.

.

Installing Liner

Installing liner

 

 

 